The project requires that contractors be made available to design and build the existing routes, which are raised dirt roads with 10
12 cm of topsoil that has been compacted (Marrum or Laterite), which may need to be further compacted in some areas, and a layer of chip sealcoat
The construction of bituminous stabilizer with stone aggregate is necessary. For the Geotechnical and Survey works, contractors were asked to complete the investigative reports.
Our strategy for this project is centered on segmenting it into Phases I and II, which should be completed in order. Following this, a more detailed explanation of the methodology to be employed for each phase will be provided.